Structure
Construction grade 25mpa High Density Concrete with steel reinforcing and 90mm foam insulation reduces heating heating costs without compromising structural integrity. Hydrostatic sub-drainage and a concrete reinforced floor.
Challenging site? Access issues - Not a problem.
As our pools are pre-engineered we do not require a crane to lift the pool into position or a large access space. Your pool will be delivered to your site on pallets, so space for the digger to work is all we require.
Wet site or inclement weather - Not a Problem.
If your site has a high water table we can simply de-water the site during the construction period that we build the panels. We also do not require ongoing fine weather during this time.